Griffen
- 14.900 m² total area
- 9.300 m² hall area
- 2 chemical pretreatments
- 1 cataphoretic dip coating system with curing oven by Eisenmann
- 3 powder coating plant (one automatic system for facade construction)
- 1 wet paint booth
- 1 spray booth for stone chip protection
- 1 two floor gelling oven with lifting- and sink station
- 1 flood waxing system
1992, has been one of the leading Austrian coating companies ever since. None of our competitors can offer a comparable performance of KTL painting with subsequent powder coating at one location. We are also the first contract coating company in Austria to use chrome-free passivation (no-rinse process) in order to be able to deliver the best possible manufacturing quality at the right time.
In order to meet the requirements of our current and future customers, we decided to restructure the company premises in Griffen and to redesign the process flow from incoming goods to packaging and outgoing goods for the finished goods. This resulted in the construction of a new production hall and the expansion of the upper floor for the final processing of body parts. With this project implementation we were able to optimize the internal goods logistics in Griffen.